Work with us

4–8 week policy-to-control pilot

A Zennite AI pilot should be bounded, measurable and connected to a real assurance pain point.

Pilot objective

Prove that a selected policy, baseline or control family can be translated into implementation-specific checks, validated against live or representative assets, and packaged into useful evidence.

Suggested pilot structure

Week 1 — discovery and scoping

  • Identify policy or baseline source.
  • Select asset population.
  • Confirm control family.
  • Define evidence format.
  • Identify stakeholder reviewers.

Weeks 2–3 — mapping and validator preparation

  • Extract policy clauses.
  • Map clauses to control intent and technical implementation.
  • Prepare validators and evidence schema.
  • Review mappings with customer SMEs.

Weeks 4–6 — validation and evidence generation

  • Run checks against agreed assets or representative data.
  • Classify compliant, non-compliant, exception and unknown states.
  • Generate evidence packs.
  • Review findings with security, infrastructure and GRC stakeholders.

Weeks 7–8 — remediation workflow and next-step plan

  • Propose remediation or exception workflows.
  • Validate approval and rollback requirements.
  • Produce pilot report and production-readiness assessment.

Success criteria

A successful pilot should demonstrate:

  • Accurate policy-to-control mapping.
  • Useful deterministic validation.
  • Evidence acceptable to security and assurance stakeholders.
  • Clear handling of exceptions and remediation.
  • A credible path to production deployment.

Contact Zennite AI to scope a pilot.