Work with us
4–8 week policy-to-control pilot
A Zennite AI pilot should be bounded, measurable and connected to a real assurance pain point.
Pilot objective
Prove that a selected policy, baseline or control family can be translated into implementation-specific checks, validated against live or representative assets, and packaged into useful evidence.
Suggested pilot structure
Week 1 — discovery and scoping
- Identify policy or baseline source.
- Select asset population.
- Confirm control family.
- Define evidence format.
- Identify stakeholder reviewers.
Weeks 2–3 — mapping and validator preparation
- Extract policy clauses.
- Map clauses to control intent and technical implementation.
- Prepare validators and evidence schema.
- Review mappings with customer SMEs.
Weeks 4–6 — validation and evidence generation
- Run checks against agreed assets or representative data.
- Classify compliant, non-compliant, exception and unknown states.
- Generate evidence packs.
- Review findings with security, infrastructure and GRC stakeholders.
Weeks 7–8 — remediation workflow and next-step plan
- Propose remediation or exception workflows.
- Validate approval and rollback requirements.
- Produce pilot report and production-readiness assessment.
Success criteria
A successful pilot should demonstrate:
- Accurate policy-to-control mapping.
- Useful deterministic validation.
- Evidence acceptable to security and assurance stakeholders.
- Clear handling of exceptions and remediation.
- A credible path to production deployment.
Contact Zennite AI to scope a pilot.